For Companies
Squads with contractually guaranteed performance
Large companies and scale-ups use BossaBox to bring speed and quality to the development of digital products.
Network of senior professionals
Product and tech specialists
Cutting-edge management methodology
140 digital products made for over 100 companies
For large companies in transformation. And for digital natives too.
Elite performance
Elite performance
Indicators collected based on the State of DevOps Survey, carried out by the DORA organization in partnership with Google.
The average performance of all BossaBox Squads was compared to the average of the Technology sector.
What you see on the side are some of the study's results.
Indicators collected based on the State of DevOps Survey, conducted by the DORA organization in partnership with Google.
The average performance of all BossaBox Squads was compared with the average performance of the Technology sector.
Below are some of the study's results.
Indicators collected based on the State of DevOps Survey, conducted by the DORA organization in partnership with Google.
The average performance of all BossaBox Squads was compared to the average performance of the Technology sector.
What you see below are some of the study's results.
6x
more deliveries
Deploy Frequency
Frequency with which software updates are released to end users.
Average: Once every 3 days
BossaBox: At least twice a day
11x
less time
Recovery Time
Time required to recover from a service outage or a problematic deployment.
Average: 11 hours
BossaBox: 1 hour
3x
faster
Lead time
Time it takes for a code change or update to be implemented in production.
Average: 3 days
BossaBox: 1 day
2x
less failures
Failure Rate
Percentage of deployments resulting in production environment failure or requiring hotfixes.
Average: 21%
BossaBox: 10%
6x
more deliveries
Deploy Frequency
Frequency with which software updates are released to end users.
Average: Once every 3 days
BossaBox: At least twice a day
11x
less time
Recovery Time
Time required to recover from a service outage or a problematic deployment.
Average: 11 hours
BossaBox: 1 hour
3x
faster
Lead time
Time it takes for a code change or update to be implemented in production.
Average: 3 days
BossaBox: 1 day
2x
less failures
Failure Rate
Percentage of deployments resulting in production environment failure or requiring hotfixes.
Average: 21%
BossaBox: 10%
Technology consultancy, reimagined
BossaBox is a technology and innovation consultancy, but fundamentally different.
Performance guarantee
Guaranteed performance, not hours
Guaranteed performance, not hours
Don't limit yourself to working hours or closed scope, have efficiency and quality metrics of the work as a guarantee in the contract.
As a performance parameter, BossaBox uses Google's DORA metrics as the main guarantee model.
Low performance? You don't pay.
Do not limit yourself to working hours or closed scope, have efficiency and quality metrics of the work as a guarantee in the contract.
As a performance parameter, BossaBox uses DORA metrics from Google as the main guarantee model.
Low performance? You don't pay.
Real gentlemen
Selected squads and professionals
Selected squads and professionals
Due to not having geographic barriers and working with greater flexibility, BossaBox has advantages when competing for talent in the market.
Each Squad is uniquely selected and composed of professionals who best meet the specific needs of your project.
Due to not having geographic barriers and working with greater flexibility, BossaBox has advantages when competing for talent in the market.
Each Squad is uniquely selected and composed of professionals who best meet the specific needs of your project.
Elastic squads
Lots of flexibility with elastic squads
Lots of flexibility with elastic squads
Have control over the Squad composition to adapt to different project phases or market moments.
That way, you can be more efficient in allocating resources while maintaining speed and delivery quality.
Have control over the composition of the Squad to adapt to different project phases or market moments.
Thus, you can achieve greater efficiency in resource allocation while maintaining speed and delivery quality.
Allocation in 10 days
10 days to allocate and scalability to grow
10 days to allocate and scalability to grow
With an extensive network of professionals at your disposal, you can have a Squad allocated in 10 days and grow your team quickly.
This way, you gain ease and assertiveness in hiring.
With an extensive network of professionals at your disposal, you can have a Squad allocated in 10 days and grow your team quickly.
Thus, you gain ease and assertiveness in hiring.
Management specialists
Specialists for you to focus on the core
Specialists for you to focus on the core
At BossaBox, you have a team of Product and Technology Specialists managing the Squad so you can be more strategic and productive.
It is the role of the team of Specialists to ensure alignment and performance at the highest level.
At BossaBox, you have a team of Product and Technology Specialists managing the Squad so you can be more strategic and productive.
It is the role of the team of Specialists to ensure alignment and performance at the highest level.
Product methodology
Aligned deliverables and results
Aligned deliverables and results
Inception, discovery, development, and deployment methods for digital products tested in over 140 projects. Co-created and iterative construction process aimed at tangible results.
It's important to make a product quickly. But it's even more important to make the right product.
Inception, discovery, development, and deployment methods for digital products tested in over 140 projects. Co-created and iterative construction process, aiming for tangible results.
It is important to build a product quickly. But it is even more important to build the right product.
Understand what makes BossaBox different
Understand what makes BossaBox different
The historically available outsourcing options are becoming increasingly unsuitable for the highly competitive and dynamic environment in which companies find themselves.
The historically available outsourcing options are becoming increasingly unsuitable for the highly competitive and dynamic environment in which companies find themselves.
Consultancies
Body Shops
Contract Template
Scope
Most work with closed scope, deadline, and cost.
Worked hours
Contract based on a previously stipulated hourly value.
Performance
Efficiency and quality-based contract model.
Talent
Unknown
Difficult to know the specific professional allocated to the project.
Allocated to clients
Professionals from the supplier allocated to one or more clients.
Prolancers
Talent compatible with the selected project from a pool of talents
Flexibility
Low
Complex and slow to change the route according to new demands.
High
Easy to adapt the investment according to new demands.
High
High flexibility to scale and adapt investments.
Management
By the consulting firm
People from consulting manage the project.
By the contractor
Client is responsible for managing who is allocated to the project.
By BossaBox
People from BossaBox manage the project.
Methodology
Project Management
Emphasis on project management: time, cost and scope.
To depend
It depends on the contracting company's management model.
Product Management
Focus on delivering value-driven results
Consultancies
Body Shops
Contract Template
Scope
Most work with closed scope, deadline, and cost.
Worked hours
Contract based on a previously stipulated hourly value.
Performance
Efficiency and quality-based contract model.
Talent
Unknown
Difficult to know the specific professional allocated to the project.
Allocated to clients
Professionals from the supplier allocated to one or more clients.
Prolancers
Talent compatible with the selected project from a pool of talents
Flexibility
Low
Complex and slow to change the route according to new demands.
High
Easy to adapt the investment according to new demands.
High
High flexibility to scale and adapt investments.
Management
By the consulting firm
People from consulting manage the project.
By the contractor
Client is responsible for managing who is allocated to the project.
By BossaBox
People from BossaBox manage the project.
Methodology
Project Management
Emphasis on project management: time, cost and scope.
To depend
It depends on the contracting company's management model.
Product Management
Focus on delivering value-driven results
Consultancies
Body Shops
Contract Template
Scope
Most work with closed scope, deadline, and cost.
Worked hours
Contract based on a previously stipulated hourly value.
Performance
Efficiency and quality-based contract model.
Talent
Unknown
Difficult to know the specific professional allocated to the project.
Allocated to clients
Professionals from the supplier allocated to one or more clients.
Prolancers
Talent compatible with the selected project from a pool of talents
Flexibility
Low
Complex and slow to change the route according to new demands.
High
Easy to adapt the investment according to new demands.
High
High flexibility to scale and adapt investments.
Management
By the consulting firm
People from consulting manage the project.
By the contractor
Client is responsible for managing who is allocated to the project.
By BossaBox
People from BossaBox manage the project.
Methodology
Project Management
Emphasis on project management: time, cost and scope.
To depend
It depends on the contracting company's management model.
Product Management
Focus on delivering value-driven results
Offered solutions
Offered solutions
Discover what solutions BossaBox offers…
Discover what solutions BossaBox offers…
Discovery Track
Discovery methods for reducing risks associated with software development.
Discovery methods for reducing risks associated with software development.
Dual Track
Discovery and complete development of products, features, new platforms and improvements.
Discovery and complete development of products, features, new platforms and improvements.
Delivery Track
Fast product delivery to unlock software development treadmill.
Fast product delivery to unlock software development treadmill.
…and how they can be applied in different use cases.
…and how they can be applied in different use cases.
New Products
Construction and launch of new internal and external products.
New Features
Improvement of products in operation through new functionalities.
New Platforms
Expansion to new web, desktop, or mobile platforms.
Rebuild
Complete reconstruction of products in operation.
What people are saying about BossaBox
What people are saying about BossaBox
High satisfaction from companies and professionals working with BossaBox
High satisfaction from companies and professionals working with BossaBox
4.9
Reviews
"
I have been with BossaBox for 4 years. We see them as much more than a vendor. We see a high-performance strategic partner. I am very satisfied and excited about what we have built together so far.
Fabio Françoso
CIO @ Advanced
"
Methodology, interest, effort, and ability to delve into the real needs of the business. Great challenges arose, and in all of them, BossaBox showed flexibility and commitment to resolve the situation.
Bruno Nunes
CTO @ Trinus
"
They promoted the seniorization of my internal team. We proved that building an ecosystem, bringing together different expertise with an elite partner, brings the speed we need to move business pointers.
Tiago Leocadio
CTO & Partner @ Grafeno
"
Assembling a team following traditional processes is painful. That's the great advantage of BossaBox. Being able to find the right people much faster and, with that, being able to move forward with much more focus and direction.
Filipe Santos
Co-founder & CTO @ Housi